Case Study – Manufacturing

Mission Critical – Issues were identified whereas, should there be a system failure at a particular time in the day, product could be left in limbo, neither checked out or billed, but in the process of being shipped to the customer. A solution was identified and processes were put in place to prevent the issue, and servers were then clustered, by adding hardware and storage to the existing solution. This covered against the possible failure, and removed the critical window where product could be lost.